Contextual hierarchy
Macro, meso and micro topics organized the way Google's systems evaluate relevance — not the way spreadsheets list keywords.
Holistic Rank unifies technical audits, on-page analysis, schema generation, entity research, topical maps, and guest-post outreach into one workspace — engineered around search-intent, contextual hierarchy, and E-E-A-T.
20+
SEO modules in one workspace
8
Schema.org types generated
100%
Semantic SEO aligned
1 click
From audit to action
A note from the team
Before Holistic Rank, a normal Tuesday looked like this: Ahrefs open for backlinks, Screaming Frog running a crawl, a Google Sheet tracking guest-post orders, a schema generator in one tab, ChatGPT in another writing briefs, Search Console in a third, and a tenth browser window full of entity research nobody would remember to use tomorrow.
The work itself wasn't the problem. The context was. Every decision happened in isolation — the topical map never met the audit, the audit never met the schema, the schema never met the outreach. Authority got assembled by hand, one spreadsheet at a time.
So we built the thing we wished already existed: one workspace where every module reads from the same entity graph, the central search intent is declared once, and every artifact downstream — a scan, a brief, a schema, a backlink — contributes to a single measurable topical authority score.
That's the whole product in one sentence. Everything else below is just how we deliver on it.
The Holistic Rank team
Building in public · Remote-first
See it in action

Most SEO tools dump a pile of numbers on you and leave. Our project dashboard is different — it shows live Search Console metrics, your monthly deliverable progress, and health scores side-by-side, so the next action is never more than one click away.

Declare your central entity, and Holistic Rank builds the topical map around it — macro clusters, meso sub-topics, micro attributes. You don't chase keywords anymore; you fill coverage gaps the same way Google measures them.

Paste a URL, pick a type, and the AI extractor reads the page, pulls the right fields, and hands you validated schema markup you can ship. No more copying from generator sites and praying Search Console doesn't yell at you.

Crawl, PageSpeed, Core Web Vitals, indexability, redirect chains, broken internals — all in one run. Issues are grouped by severity and each one is linked straight to the page it hurts, so triage takes minutes instead of afternoons.

Browse the catalog, brief the anchor text, place the order, track it to publish — all inside the same project as the page it's pointing to. No more spreadsheet archaeology when a client asks where a link came from six months later.
About Holistic Rank
We built Holistic Rank for modern SEO teams who think in topical maps instead of keyword lists. Every module — from the site audit to the schema generator — is wired to the same entity graph, so the work you do on one page compounds across your whole domain.
The result is an SEO platform that understands macro context, micro context, and source context — the three pillars Koray Tuğberk Gübür identified as the foundation of semantic search success.
Every project starts with a declared central entity and search intent, so every artifact — pages, schemas, outreach — stays on topic.
Topical maps, entities, internal-link suggestions and E-E-A-T signals all read from the same graph. One source of truth, zero context switching.
Live coverage score, historical data and Search Console deltas tell you exactly when you've earned authority — not just ranked once.
How we're different
Ahrefs, SEMrush and Moz are great at reporting what happened. We're built to change what happens next — using the same semantic principles Google's ranking systems actually use.
Holistic Rank
Holistic Rank is engineered around the principles Koray Tuğberk Gübür codified — the same semantic fundamentals modern search engines use to judge authority. The framework isn't a feature; it's the spine of the product.
Macro, meso and micro topics organized the way Google's systems evaluate relevance — not the way spreadsheets list keywords.
Every project is anchored to a declared central entity and intent. Every artifact downstream inherits that context.
We track the attributes and sub-entities your central topic requires — so you can see gaps before your competitors do.
Schema markup is generated from the same entity graph powering your topical map. Consistency becomes the default, not an afterthought.
Why it matters
When your audit, content, schema and outreach all read from a shared entity graph, you stop optimizing pages in isolation and start building topical authority — the only ranking factor that compounds.
Frequently asked questions
Create your first project in under a minute. Connect Search Console, declare your central entity, and let the platform do the heavy semantic lifting.